Installation adapter (SNV305)
The fault indicator can be mounted while the overhead line is working.
Step 1:Open the steel clamp by two hand through push the left and right out. (see the Figure 1.)
Step 2: Insert the opened indicator into a mounting adapter along that four “semicircular guide groove”.
Then Gently push adapter up, at same time, turn adapter right , make the indicator into to a fixed position,
and make sure the indicator can not pull out from the adapter. (see the Figure 2.)
Step 3: Put indicator onto the overhead line cable with a tools. Simply push the indicator against the cable, so that
the conductor fits into the open “spring clamp”. The spring clamp closes automatically after a light push.
(see the Figure 3.)
Note:Figure 4 shows the correct installation, and Figure 5 shows the incorrect installation.
QQ: 626387134
Phone:+8613570657698
Tel: 0756-8621065
Email: snovatech@163.com
Add:4th Floor, Building 1, Zhuzhou Industrial Park, No.9, Pingdong 6th Road, Nanping Town, Xiangzhou District, Zhuhai city ,Guangdong province ,China